Baden Valve Lot and Pump Station Expansion

Contact Us




Baden Valve Lot and Pump Station Expansion

Client Transdyn, Inc.
Location San Mateo County, CA
Scope Of Work Schedule Delay Analysis, Construction Claims Analysis, Claims Identification
Schedule 2008

Project Detail


The Baden Valve Lot & Pump Station Expansion project in San Mateo County, California consisted of installing a pump station standby generator, replacing the valve lot water sampling station, performing equipment and building seismic upgrades, and installing a pump station surge suppression system. Spire’s consultants assisted the California-based contractor and equipment vendor in evaluating and quantifying schedule delays and disruptions that occurred during the $4 million wastewater treatment plant. Spire’s analysis included review of contemporaneous schedules, construction documents, and interviews with project personnel to determine actions/inactions that led to delays and disruptions. Spire’s findings assisted with the successful resolution of the claim before arbitration saving the client thousands of dollars.