The H. Carl Moultrie Courthouse project involved the upgrades and renovations of the Superior Court of the District of Columbia. The scope included the replacement of the electrical infrastructure to include high voltage switch line-up, double-ended substations, generators, paralleling gear, switchboards, risers, and panel boards. To achieve this upgrade, other areas and systems required major modifications. Spire Consulting Group, LLC was retained by M.C. Dean to provide comments regarding the schedule analysis method, to conduct an independent schedule analysis, and to prepare reports of findings.